Industry

Education

Campuses are open by design, which makes controlled entry and clear evacuation the whole problem.

What changes here

Key considerations

  • Lockdown and controlled entry
  • Lecture theatre and classroom AV
  • Evacuation across dispersed buildings
  • Works completed in term breaks

Next step

Send us the drawings. We will send back a scope.

Tender documents, a floor plan, or a description of the problem — any of these is enough to start.